Our Services

Production Facilities

We strictly follow IS Standard (2629)

ZINC kettle – 6.5 L x 1.2 W x 1.2 D (Meter)

Overhead Cranes – 5MT capacity – 04 Nos

Pickling Line – 06 Nos Tanks – 10 L x 1.2 W x 1.2 H

Acid Fume Exhaust Scrubbing System – 20,000 CFM

White Fume Exhaust Scrubbing System – 15,000 CFM

Hot Air Dryer Unit – for 5 volume changes/min

Flux Heating System – PLC Based`

Material Handling System

Acid Storage Tanks – 30Kl capacity

Waste Acid / Water Storage Tanks – 30Kl capacity

Quench & Passivation Tanks

Encapsulated Pickling Area – will be installed within 6 months of operation

High Velocity Burners – LDO Fired ( we will be switching over to PNG within1 Year of Operation – as per the availability of the gas)

We have Testing Lab facility in our factory

Enough Space for Materials

Seperate Crains for Loading and Unloading

Design & Testing Standards

01

Hammer Test

02

Knife Test

03

Preec Test

04

Copper Sulphate Test

05

Thickness Test – Visual – with Elcometer